PreferencesDialog
Qt::ApplicationModal
0
0
378
193
Preferences
true
-
0
0
Preferences
-
-
false
If the specified number of jobs (or even more) is already running, the next one will NOT be launched yet.
Maximum number of running jobs:
-
false
80
0
If the specified number of jobs (or even more) is already running, the next one will NOT be launched yet.
1
16
-
Qt::Horizontal
0
20
-
-
Automatically launch next job when a running job completes
-
Qt::Horizontal
QSizePolicy::Fixed
12
20
-
Qt::Horizontal
QSizePolicy::Fixed
8
20
-
Qt::Vertical
QSizePolicy::Fixed
20
8
-
-
Shutdown computer as soon as the last job has completed
-
Qt::Vertical
QSizePolicy::Fixed
20
12
-
Qt::Vertical
QSizePolicy::Fixed
20
12
-
-
Qt::Horizontal
40
20
-
100
0
Close
:/buttons/accept.png:/buttons/accept.png
closeButton
checkRunNextJob
spinBoxJobCount
closeButton
clicked()
PreferencesDialog
accept()
339
157
199
89
checkRunNextJob
clicked(bool)
spinBoxJobCount
setEnabled(bool)
188
55
294
93
checkRunNextJob
clicked(bool)
labelJobCount
setEnabled(bool)
188
55
136
93